Daily coverage from across the country, written for the expat community
Results for “CENACE”Clear
Peak demand on the Ecuadorian electrical grid hit 5,333 MW on April 10 — roughly 20% above normal, and enough to trigger rolling blackouts across Guayaquil, Daule, and Samborondón. The Ministry of Environment and Energy suspended all scheduled grid maintenance on April 14 to free up capacity. Here's what's happening and what to expect.
Environment and Energy Minister Inés Manzano announced leadership changes at both CNEL (the national distribution utility) and CENACE (the grid operator) this week after widespread blackouts and what she called 'slow and inefficient' responses. Juan Carlos Blum — a mechanical engineer with a background in multilateral energy work — is the new CNEL general manager.
Mazar, the critical reservoir feeding Ecuador's largest hydroelectric complex, has fallen to just 22 meters above its operational minimum. With the dry season outlook uncertain, the specter of the 2024 blackouts -- when Ecuadorians lived through 14-hour daily power cuts -- is back on the table.
After devastating blackouts throughout 2024 and into 2025, Ecuador's electricity outlook is the most optimistic in over a year. Heavy rains have refilled major reservoirs, Mazar dam hit maximum capacity, and a new 200 MW plant is online. But risks remain.
Ecuador's grid operator CENACE has ordered businesses to self-generate electricity from 9 AM to 11 PM on weekdays since March 17. The Coca Codo Sinclair dam is operating at 37% capacity, and Colombia has suspended 450 MW in electricity exports.